Kitchen & Bath Pricing Calculator
Price every kitchen and bath job to actually hit your margin. Add materials, labour, and overhead, set the margin you want, and get the number to quote.
Built for kitchen and bath owners who'd rather know than guess. Your numbers stay in your browser.
| Materials | $12,250 |
| Labour | $10,540 |
| Other direct | $0 |
| Total cost | $22,790 |
| Profit at this price | $9,767 |
Pricing to margin (cost ÷ (1 − margin)) hits your number. Adding a flat percentage on top of cost quietly undershoots it.
What you get
Three reasons this earns its place on your desk
Quote to a margin, not a hunch
Enter your real costs and the margin you want, and the calculator returns the price that delivers it.
See where the profit goes
A clean breakdown of materials, labour, overhead, and profit on every job, so nothing hides.
Catch the jobs that lose money
Run a job before you quote it and you will spot the kitchen and bath work that is priced to lose before you sign it.
How it works
The math behind the number
Total your direct costs — materials, labour at its true hourly cost, and other direct items — then divide by one minus your target margin. That markup is what actually hits the margin; adding a flat percentage on top of cost undershoots it.
The defaults
Kitchen & Bath benchmarks (2026)
The calculator starts from the 2026 figures sourced below, so the first number you see is realistic, then you replace them with your own.
| Benchmark | Typical value |
|---|---|
| Average job value | $35,000 |
| Gross margin | 29.9% |
| Net profit margin | 6.3% |
| Median field-tech wage | $31.55/hr |
| Payroll burden | 30% |
| Billable utilization | 62% |
| Billed labour rate | $85/hr |
| Close rate | 30% |
| Marketing % of revenue | 7% |
Sources
- BLS May 2025 OEWS — Carpenters (47-2031) median/mean wages
- NAHB — Home Remodeling Profit Margin Jumps (Remodelers' Cost of Doing Business Study, 2024 data: 29.9% gross / 6.3% net)
- Eye On Housing (NAHB) — Remodelers Saw Profit Margin Gains in 2024
- Houzz — 2025 U.S. Houzz Kitchen Trends Study (median kitchen spend)
- ServiceTitan — Billable Hours / technician utilization (Home Service Business Institute 58-65%)
- SmartBarrel — Labor Burden in Construction (25-40% on top of wage)
- Hook Agency — What's a Good Closing Rate for Contractors?
- Angi — How Much Do General Contractors Charge Per Hour (2026)
- OnPurpose Media — Marketing Budget for Contractors (% of revenue)
Get the download
Email me the editable pricing sheet
Get the spreadsheet so you can price every job to margin and keep your defaults current.
FAQ
Common questions
- How should a kitchen and bath contractor price a job?
- Total your direct costs — materials, job labour at its true cost, and any direct overhead — then divide by one minus your target margin. That markup is what hits the margin; adding a flat percentage on top of cost usually undershoots it.
- What is the difference between markup and margin?
- Margin is profit as a share of the price; markup is profit as a share of cost. A 25 percent margin needs about a 33 percent markup. The calculator handles the conversion so you quote the right number.
Want the same read on your own website?
The Site Inspection scores your contractor site on 100 points and shows you, with evidence, where ready-to-book homeowners slip through. First several free each week.